GOV.UK
Guidance
This Information Note explains the UK’s procedures for conformity assessment and acceptance of marine equipment for UK ships in the event that the UK Withdraws from the EU without a deal on exit day (29 March 2019).
PDF, 230KB, 8 pages
This notice should be read with The Merchant Shipping (Marine Equipment) Regulations 2016 SI 2016/1025 as amended by the Merchant Shipping (Marine Equipment) (Amendment etc.) (EU Exit) Regulations 2019 SI 2019/470 (“the Regulations”’), MSN 1874 Amendment 3 (M+F), MGN 606 (M+F) and MGN 607 (M+F).
In the meantime for current regulations, please refer to MGN 554, MGN 557 and MSN 1874 (M+F) Amendment 2.
This MIN expires 01 April 2020